PRG stages the first Fielmann Online Annual General Meeting

23/07/2020
Overview

For many years now, Germany's most successful optician Fielmann has been working with PRG to ensure that the annual general meetings and press conferences are carried out with technical and visual perfection. Due to the Corona crisis, like many, this event were held online for the first time this year. After PRG had already successfully implemented the Fielmann annual accounts press conference as a streaming event a few weeks ago, the aim was now to stage the considerably more complex Annual General Meeting as a purely online event, so that shareholders could view it conveniently and securely on their home computers.
 


 

For this purpose, two studios were used in the Hamburg Cinegate Studios, which belonged to PRG, to ensure the event both complied with social distance rules and kept the entire event technology separate from the large stage with the board members of Fielmann AG - if only for acoustic reasons. 

As usual, PRG provided a 360° service here, including sound, lighting, video, streaming connections as well as stage and decoration construction. The basis for this was the stage and lighting design created by Jerry Appelt.

The heart of the stage design consisted of a high-resolution ROE Black Onyx2 LED wall (5,984x1,760px at 2.8mm pixel pitch), with a size of 17x5 meters, on which backgrounds and various recordings during the HV were shown. The video feeds were done via Watchout (for the backgrounds) and the Screen Management System (for overlays and PiP).

PRG used three camera systems - plus a camera on rails, which provided a dynamic image impression to showcase the AGM.

For the illumination Jerry Appelt relied on lighting fixtures from GLP: the washer and the spots of the S350 series (with aperture slider) – as a contemporary replacement for step lenses and profile spotlights. To create a bit of architectural space, the GLP-X4 bars were placed to the left and right of the stage in the studio, with FR1 LED moving lights as spotlights above the LED wall.

Tom Kaczmarek (Senior Account Manager PRG), who has been responsible for Fielmann events for many years, once again pulled all the strings and, together with the colleagues and associated companies involved, ensured that this year's streamed AGM was technically perfect and shared seamlessly across a 'digital stage' to the complete satisfaction of Fielmann AG.

Wir danken:
Fielmann AG
GLP (German Light Products) 
Jerry Appelt Lighting Design
Udo Kinnigkeit (Concept for Vision, Set Construction)
Kai Picht (Catering)

Back to top
X
Share link:

Thank you! We have forwarded the link.

Your information will not be divulged.
More in our Data privacy statement.

Not all mandatory fields have been filled out or the email address is not valid.

PRG.RequestMail.OverlayTitle
PRG.RequestMail.SuccessMessage
PRG.RequestMail.ErrorMessage