- Nearly 60,000 feet (11+ miles) of fiber optic cable was used, enough to stretch across 150 football fields.
- Elation Proteus Radius fixtures lit up the stage, fresh off their debut at the CMA Awards.
- Pathway Connectivity developed and tested a new solution for their Via 12 Ethernet Switches, ensuring seamless fiber integration for the lighting system.
- The team provided an additional 55 fixtures, networking infrastructure and atmospherics for various pre-game events.
- PRG also equipped Van Wagner’s ‘auxiliary control room’ with flypacks including modular furniture as well as camera packages to capture talent, celebrity shots, pre-game elements and more.
“I’ve collaborated with PRG worldwide for decades because I value their approach—supporting both me and the production throughout pre-production, the show and beyond. They always make it work, and their crews take real pride in every project’s success.” — Al Gurdon